HẠ LONG – VÂN ĐỒN EXPRESSWAY

Spanning a lengthy 60km, Halong – Van Don Expressway has a maximum speed of 100km/h. With four lanes for regular transport and two emergency stopping lanes, the new expressway cuts travel time between Halong and Van Don by half, from one and a-half hours to only 50 minutes. The direct route to the capital city encourages strong cultural and commercial flows throughout the triangle zone of Hanoi – Haiphong – Quang Ninh, as travelling from Hanoi to Van Don now only takes two hours and 30 minutes instead of a lengthy 5-hour-drive, enhances the connection of the growth triangle of Hanoi – Hai Phong – Quang Ninh, and contribute to the economic and social development of Quang Ninh.

PROJECT INFORMATION
Investment form: Build – Operate – Transfer (BOT) Contract.
Investor: Sun Group
Total investment: 12,000 billion VND
Address: Van Don economic zone, located at Doan Ket commune, Van Don district, Quang Ninh province
Commencement: 2015

Completion: 2018